Product successfully added to your shopping cart
€1,035.09 HT
Configure product

Sorry, this product is not available for sale at the moment

View products in the same category

Customization request

We look forward to working on your offer! Please fill in the fields below

Choisir un visuel (Max 20MB)

Frame + outlet + 7 debris chutes set / pce

  • New
Frame + outlet + 7 debris chutes set...
  
€1,035.09 HT

Ref : FGT-KITPPS1

Sorry, this product is not available for sale at the moment

View products in the same category
Quantity
 

Similar products

Description

Product

A complete debris chute starter kit including a frame, outlet section, and 7 chute sections, designed to efficiently channel construction waste from elevated work sites to ground level.

Specifications

  • Kit includes one frame, one outlet/departure section, and seven debris chute sections
  • Constructed from durable plastic materials engineered to withstand impact from heavy construction debris
  • Modular design allows sections to connect securely for a continuous, sealed waste evacuation channel
  • Compatible with standard scaffolding setups for straightforward installation
  • Designed for repeated use across multiple construction or renovation projects

Usage

Attach the frame to the scaffolding structure, connect the departure section, then link the seven chute sections sequentially. Debris is fed from the top and guided safely downward, reducing dust dispersion and improving site safety during demolition or renovation work.

FAQ

  1. How many chute sections are included in the kit? The kit includes seven debris chute sections, plus one frame and one departure section, providing a ready-to-use evacuation system.
  2. Can additional chute sections be added to extend the length? Yes, the modular design allows extra sections to be connected to accommodate greater working heights.
  3. What type of debris is this chute system suitable for? It is designed for general construction and demolition waste such as rubble, broken tiles, plaster, and similar materials.
  4. How is the kit attached to the scaffolding? The frame is secured directly to the scaffolding structure, providing a stable anchor point for the entire chute assembly.
  5. Is the kit reusable across multiple projects? Yes, the components are built for durability and can be disassembled, cleaned, and redeployed on subsequent job sites.

mvm-dt-2026-03

See more